+49 211 661452
How do you convert a plant during operation without disturbing the production process? In Bochum, we were allowed to document this organizational challenge of a turnkey assembly over a longer period for SMS Meer.
To do this, we filmed long-term shots with stationary cameras in addition to the usual shots. This allowed us to use impressive time-lapse shots in the edit.